Field results

Field Results – AST and PDC Replaces Turbine in Hard Sandstone

Objectives

The primary objective was to maximise drilling efficiency in the 5 5/8” section through the hard abrasive Lower Fulmar Sandstone. A turbine BHA was initially chosen to meet this arduous challenge however Total had concerns due to  twist offs and poor bit performance on previous wells and the use of a Turbine could indeed exacerbate these issues. With this in mind, Total decided that the least risky strategy would be to run an AST on a rotary BHA.

Results

A 4 ¾” Tomax AST, with high temperature seals on a rotary assembly proved to be the correct choice for Total with the tool providing the longest bit run in the Lower Fulmar formations to date only tripping due to hours on the BHA components. Bit cutting structures were graded 2-2 and 2-1 compared to offsets of 3-3 and 3-4. No twist offs or torque issues were experienced and the expected ROP for the section was increased by 50%.

Value

With a spread rate in excess of £300,000/day, the Tomax AST provided a saving in excess of £2.2 Million for ROP alone – before counting the saving from no failures.

The field is being developed by Total. This well was drilled by jack-up Gowan Gorilla 5.

More images:

Field

Franklin West

Country

UK

Rig

Rowan Gorilla V

Tool

4 ¾” XDT-AST (Rated to 220 deg. C)

Operator

Total E&P UK

Well

29/5b-H2z

Bit

5 5/8”

BHA

5 5/8” PDC, NB Stab, Float Sub, Stab, DC,Tomax AST

Time

May 2015

PrintPrint field result Send to friendSend to friend

Send to a friend